Before
During
After The building site elves were out last night. When Brian the builder left the site there were pallet-loads of bricks strewn everywhere. When he gets there this morning they will all have been stacked strategically for him to re-start building straight away. We stacked 450 blocks last night as well as leveling sections of the sand & gravel floor to the inside of the foundations. It is beginning to look good. A pity it will all be buried out of sight!
the bricks stacked like that remind me of the excavations at Pompeii 🙂
LikeLike