First there was the pesky job of putting a drainage gully at the low point of the drive and providing it with a soakaway. We dug a hole 1 metre square and 1 metre deep.
Then we had to fill the hole with all the random stones we had dug up over the last year.
And we have made a start on the garage. That’s another 300 concrete blocks to lay
And we have finally found some topping stones to finish off the wall. Thanks to a kindly neighbour who had some going spare.






